The steps of a custom kitchen project, from the visit to installation

A custom kitchen project runs in five steps: visit and measurements, 3D plans and quote, a permit if needed, workshop fabrication, then site work and installation. At Ébénisterie SAM, fabrication takes 3 to 6 weeks after the plans are approved, and a turnkey kitchen is delivered 2 to 8 weeks after approval.

By Akram Samman, master cabinetmaker · Last updated:

Cabinetmaking bench with a clamped oak cabinet door and hand tools
Mood image

In short: 1) visit and measurements, 2) 3D plans and quote, 3) permit if needed, 4) workshop fabrication, 5) site work and installation. You approve the plans before fabrication starts.

Step 1: the visit and measurements (week 1)

We come to your home for a free assessment visit: laser measurements and an assessment of the structure (load-bearing walls, plumbing, electrical). To get the most out of it, prepare:

  • photos of your current kitchen and a few pictures of kitchens you like;
  • your budget range, even a rough one;
  • the list of appliances to keep or buy, with their dimensions if you know them;
  • what does not work today: not enough storage, a wasted corner, an island that is too small.

Step 2: 3D plans and the quote (weeks 2 to 3)

We prepare photorealistic renderings so you can see the result, and a line-by-line quote: box and front materials, hardware, finishing panels, delivery, installation and exclusions. We bring samples of wood, veneer and lacquer; our guide solid wood, veneer or lacquer helps you choose. Nothing is built before you approve the plans.

Step 3: the permit, if needed

Replacing cabinets, counters and finishes generally does not require a permit in Montreal. You need one as soon as a load-bearing wall is opened or the sink changes place. For a turnkey project, we prepare and file the application with your borough. Details in our guide renovation permits in Montreal.

Step 4: workshop fabrication (3 to 6 weeks)

Your cabinets, island and millwork are built by our cabinetmakers in our Dorval workshop. The workshop can be visited by appointment if you want to see your kitchen being built or approve a finish.

Step 5: site work and installation

Site protection, clean demolition, work by certified trades, then installation by the cabinetmakers who built the cabinets and a final inspection. When only the cabinets are replaced, installation takes about one week. A turnkey kitchen is delivered 2 to 8 weeks after the plans are approved.

What does a typical timeline look like?

StepTimelineWhat you do
Visit and measurementsWeek 1Prepare photos, inspiration and budget
3D plans and quoteWeeks 2 to 3Choose materials and approve the plans
Permit (if structure or plumbing moves)Depends on the projectSign the application we prepare
Workshop fabrication3 to 6 weeksPrepare the room and order the appliances
Installation (cabinets only)About 1 weekClear the kitchen

What can delay the schedule?

  • A change of plan after approval, which means rebuilding cabinet boxes.
  • A permit being needed (load-bearing wall, moved plumbing) or a sector under PIIA rules.
  • A surprise behind the walls, common in older homes and plexes.
  • Appliances chosen late or delivered late, when the boxes are built to their dimensions.

Ready to start? See how we build custom kitchen cabinets and our price ranges, or describe your project: we call you back the same day.

FAQ: steps and timelines

How long does a custom kitchen project take in total?

Allow about two to three weeks for the visit, plans and quote, then 3 to 6 weeks of fabrication and one week of installation for cabinets only. A turnkey kitchen is delivered 2 to 8 weeks after the plans are approved, depending on the scope of work.

Do the visit and quote cost anything?

No. The assessment visit and the detailed quote are free with no obligation. We call you back the same day you send your request.

Do I need a permit to redo my kitchen in Montreal?

No, if you replace cabinets, counters and finishes without touching the structure or moving plumbing. Yes, as soon as a load-bearing wall is opened or the sink changes place.

When should I choose my appliances?

Before the plans are approved: the cabinet boxes and integrated appliance panels are built to their exact dimensions.

Get a price for your kitchen

Send us a photo, your dimensions or your plans. We call back the same day and prepare an itemized quote, free and with no obligation.

Prefer to talk to someone?

Call 514 279-2626

Monday to Friday, 7 a.m. to 5 p.m.

Free quote in 30 seconds

Three quick questions. We call you back the same day.

Step 1 of 3No obligation

What is your project?
A few details about your project

Both fields are optional: skip ahead if you prefer.

Where can we reach you?

Same-day reply · No obligation · Free on-site assessment

CallFree quote